|
We plan for the
New Learning Center to be a LEED certified
"Green" building. We would like to enable
students to learn about solar, wind and
geothermal power generation.
After an extensive
search we contracted with GWWO to design the New
Learning Center. To date a preliminary design
has been developed and estimated. The design has
been revised to significantly reduce the cost of
the building. We now plan to build in two
phases. Phase I will have sufficient space to
allow us to operate indefinitely. In time we
hope to grow to need Phase II.
The site plan has
been developed in conjunction with a new
entrance road to Iron Hill Park.
Further design
development will be initiated further along in
the capital campaign.
The preliminary
site plan is available for inspection, review
and comment by contacting the Director of the
Iron Hill Museum or the President of the
Academy. |